Industry: Carbon Capture and Helium

  • Relief Solutions for CO2 Capture and Injection Projects

    Relief Solutions for CO2 Capture and Injection Projects

    At one of our recent ethanol projects, we were tasked with developing a relief solution for a dense-phase CO2 system. Like most early-stage sequestration sites in the U.S., this one had no simple way to recycle or offload off-spec product during a process upset. When working with dense-phase CO2, roughly 300 psi and as cold as -15°F, you’re dealing with a unique beast. It’s cold, high-pressure, and doesn’t behave like most fluids in a natural gas processing plant.

    If the transport offtake shuts in or the CO2 goes off spec, the challenge becomes: how do you relieve this safely? What makes it especially challenging is how rapidly it changes states under relief conditions. This phase change can cause various operational issues and presents a massive safety hazard. API STD 521 is considered the bible, but this was one of those times when we had to look beyond the basic code.

    Problems with Relieving Dense-Phase CO2

    Safe operational design of CO2 capture facilities requires relief designs for dense-phase CO2 through a PSV.  Relieving the CO2 liquid will induce a pressure drop and phase change, dramatically reducing the temperature during the relief. As the liquid expands, it pulls heat from its surroundings and transforms into a solid, sublimation effect. Dry ice begins to form at around -130°F. Relief temperatures can dip even lower, closer to -180°F. At these temperatures, you’re almost guaranteed to get solids that can:

    • Clog or choke the relief device,
    • Reduce flow capacity, or
    • Completely block the path to relief.

    A blocked relief device means the vessel is no longer protected. Leaving you with a serious safety issue. As more CO2 capture and processing facilities are constructed, the normal approaches for relieving unsafe conditions won’t work for CO2. This requires that we develop solutions that protect the equipment while leveraging best practices from the industry.

    Code API STD 521 and Solid CO2 Plugging Risks

    API STD 521: Guide for Pressure-relieving and Depressuring Systems is the go-to standard for pressure-relieving systems, as it acknowledges this flash freezing issue. Section 4.9.2 touches on “Liquid-Vapor Mixture and Solids Formation” and warns about the potential for flashing fluids to cause choking or blockages. It also cites wet propane as an example of a fluid that can form solids.

    However, there’s an issue. API STD 521 states that “some fluids (e.g. carbon dioxide and wet propane) can form solids when they are discharged through the relieving device. No uniformly accepted method has been established for reducing the possibility of plugging”.

    There’s no established method to reliably predict or mitigate plugging caused by solid CO2 formation. It tells you the hazard exists but leaves the solution up to you. This was the biggest gap we have found and had to address in the design of our CO2 capture facilities.

    Image of client Distillation tower for CO2 Purification

    An Approach to Pressure Relief for CO2 Processing: “Burping” CO2 Safely

    We started with a question: What’s the safest way to handle relief of pressure for dense-phase CO2 that can’t be recycled or sent down the line?

    One solution we have designed in our processing facilities for CO2 is to block and hold the system and send large volumes of the dense phase liquid to the distillation column through control valves that trigger based on plant upsets. The column is capable of holding large volumes of CO2 and any amount that vaporizes while being held can naturally vent through the overhead vent.

    Thermal relief valves (TRV’s) are used to protect any equipment and piping that can possibly be isolated by check valves and can’t be sent to the distillation column during a block and hold scenario. While a pipeline is shut in, and if the pipeline is exposed to a heat source, such as heat from solar radiation or even ambient conditions during hot summer months, the internal process material will also heat up, expand, and increase pressure. In this case, the CO2 is at the bubble point and can vaporize with heat exposure. If thermal expansion occurs, these TRV’s will relieve this isolated high-pressure vapor, and prevent over pressurization of the system. Once the vapor is relieved, the TRV will reseat, and not allow further relieving.

    This constant relieving and reseating, or “burping” of warm, vaporized CO2 will reduce the risk of relieving dense phase CO2. This approach avoided the extreme phase change that commonly resulted in dry ice plugs.

    The Trading Off to Venting CO2: Safety vs. Speed

    Burping CO2 is a potentially time-consuming process. The maximum amount of dense phase CO2 possible is sent to the distillation column. However, this CO2 still has to vaporize naturally. The CO2 is condensed at bubble point temperature, so the delta temperature it has to overcome is relatively small, allowing the CO2 to vaporize in a relatively reasonable amount of time. The phase change, however, still imposes temperature issues due to the Joules-Thomson effect, and still has risk of plugging up the vent piping. Careful pressure monitoring of this vent is implemented to mitigate this risk.

    The remaining CO2 to be relieved by the thermal relief valves will naturally reset once vaporized CO2 is relieved, naturally mitigating the risk of freezing and plugging. Considering the size of a plant, this can quickly take a long time to relieve an entire process. At CANUSA, we believe that this careful vapor relief vs. the prevention of piping freezing and plugging method is the safest known relief strategy for dense-phase CO2 if no recycle solution is available.

    CO2, unlike the relief of natural gas, is heavier than air and will sink or collect in low-lying areas.  Therefore, venting locations need to be considered for safe release to ensure that de-oxygenated zones don’t form and there is adequate dispersion. Typical solutions include a vent pipe from the CO2 relief valves to higher elevations to allow the CO2 to disperse.  A slower release using the Burping method will release smaller amounts of CO2 over a longer period, reducing the risk the accumulation to unsafe concentrations. OSHA incidents for CO2 handling indicate how important dissipation considerations are for the safe operations of these facilities.

    Considering Process Solutions to Reduce CO2 Venting

    Reducing the scenarios of release to the atmosphere not only increases the safety of the operations, but less vented CO2 will also contribute to higher capture rates and more revenue.

    To reduce the scenarios of vented CO2, recycle designs can be incorporated into the process. For some facilities, a recycling approach using a closed-loop system via a cooler and blower can reduce the need to vent altogether.

    This isn’t always economical. Controlled heating of dense-phase CO2 to transition to a gas phase takes considerable energy. The CAPEX of this type of system is often cost prohibitive for the low increase in recapture rate, but it could mean a true 100% capture operation.

    Engineering Safety into CO2 Capture Facilities

    This project made one thing very clear: the CO2 sequestration industry is evolving quickly, but the standards aren’t updating at the same speed.

    We’re seeing more clients face similar problems – like what to do when a process upset sends off-spec CO2 surging through the system? API STD 521 offers the “what,” but not the “how”. Safety is vital; so, sharing solutions for the “how” is important.

    Our client for this carbon capture project required:

    1. Thoughtful engineering to manage dense phase CO2 during upsets
    2. Minimal contamination of dense phase CO2 product – less than 10 ppm O2 in product
    3. Limited venting to the atmosphere

    Our team developed a practical, field-ready solution. It’s not fast. But it satisfied all of our clients’ requirements and was the safest design.

    ________________________________

    HAVE INSIGHT ON THIS?

    If you have experienced this or want to weigh in with your insights, please join the conversation on LinkedIn. Visit this post and see what others have to say!

    Author(s)

    Nick Brown | Project Engineer

     

    External Sources:

    https://www.apiwebstore.org/standards/521

    https://www.osha.gov/publications/hib19960605

     

     

     

     

     

     

     

     

  • Navigating Colorado AQCC Regulation 22: How CO2 Regulations is Impacting Natural Gas Processing Plants

    Navigating Colorado AQCC Regulation 22: How CO2 Regulations is Impacting Natural Gas Processing Plants

    As Colorado increases its efforts to combat climate change, the regulatory landscape for industrial operators (particularly in the natural gas processing plant and gathering system sectors) is evolving rapidly. The latest development, Colorado Air Quality Control Commission (AQCC) Regulation 22, introduces stringent greenhouse gas (GHG) reporting and reduction mandates that will significantly impact how midstream infrastructure is designed, operated, and maintained.

    Understanding Regulation 22

    Regulation 22, formally titled Colorado Greenhouse Gas Reporting and Emission Reduction Requirements (5 CCR 1001-26), establishes a comprehensive framework for monitoring, reporting, and ultimately reducing GHG emissions across multiple sectors of the state’s economy. For midstream operators (those responsible for gathering systems, natural gas processing plants, and transportation), this regulation will require balancing the development needs of producers and the emissions caps related to GHGs.

    The rule mandates that Annual GHG reporting will be required for facilities that emit over 25,000 metric tons of CO₂e per year, as well as multiple sources if they fall below the federal reporting thresholds (e.g., the 25,000 metric ton CO₂e threshold under EPA’s 40 CFR Part 98).

    Emission reduction targets are aligned with Colorado’s broader climate goals: a 26% reduction by 2025, 50% by 2030, and 90% by 2050 (from 2005 levels) established under  HB 19-1261.

    On February 14, 2025, regulatory provisions became effective requiring every midstream company to participate in the emissions reduction program. They must achieve a collective midstream segment cap of 3,930,228 metric tons CO₂e by December 31, 2030, and maintain company-specific caps annually thereafter.

    Implications for Midstream Project Development

    From a project development perspective, Regulation 22, which was adopted in October 2024 and went into effect in early 2025, requires a paradigm shift. No longer can emissions be an afterthought. GHG emission reduction and methane reduction must be embedded from the earliest stages of project planning.

    Here’s what midstream developers will need to consider with their emissions planning:

    Carbon Footprint Assessments for New and Existing Assets

    Developers must evaluate the lifecycle emissions of both current and planned infrastructure. This includes emissions from:

    • Compressors and natural gas processing plants
    • Fugitive methane leaks from gathering systems and pipelines
    • Combustion sources such as flares and engines

    Integrating carbon modeling tools into the front-end engineering design (FEED) process is now essential to determine how overall emissions levels will be impacted for the operator. The company-specific emissions caps are calculated using each operator’s 2021 MFCE GHG emissions.  October 2025 will require reporting under this program.

    Technology Integration for Emission Reduction at Existing Assets

    To meet reduction targets, midstream operators will consider solutions to lower the overall GHG emissions:

    • Electrification of engines at compressor stations and natural gas processing plants
    • Deployment of low-bleed or zero-bleed pneumatic devices
    • Advanced leak detection and repair (LDAR) programs
    • Carbon capture and storage (CCS) feasibility for large emitters

    Operators will expect to see increased CapEx costs for compliance with marginal increases in processing capacity.  Some assets may be consolidated and decommissioned before the planned end of useful life. Client will focus on reducing their methane emissions first, considered 25 times more potent than CO2 emissions. CANUSA EPC has various solutions documented for ideas, check out a novel capture application for Turbine Seal Gas Capture.

    Regulatory Compliance Strategy

    Operators must establish robust compliance systems that include:

    • Real-time emissions monitoring
    • Accurate data collection and reporting mechanisms
    • Internal audits and third-party verification

    Failure to comply could result in penalties and reputational damage, especially as public scrutiny of fossil fuel infrastructure intensifies.

    Civil penalties for midstream operators, under C.R.S. § 25-7-122, outline that violators may face civil penalties of up to $47,357 per day, per violation, with the amount adjusted annually for inflation. These penalties apply to a wide range of noncompliance issues, including failure to meet greenhouse gas (GHG) reduction targets, inadequate emissions reporting, and violations of leak detection and repair (LDAR) or combustion control requirements. In severe cases, the Colorado Department of Public Health and Environment (CDPHE) may also seek injunctive relief through the courts to compel compliance or halt operations.

    In egregious circumstances (such as willful misconduct, repeated violations, or incidents causing serious harm), operators may also face permit suspension or revocation under C.R.S. § 34-60-121, enforced by the Energy and Carbon Management Commission. While this statute is relevant to upstream operators, it is not directly applicable to midstream GHG violations under Regulation 22 is not clearly defined. These consequences underscore the importance of strict regulatory compliance, accurate emissions tracking, and timely communication with regulators.

    Looking Ahead for Natural Gas Processing Plants

    Colorado’s Regulation 22 is not just a regulatory hurdle—it’s a signal of the energy transition underway. For midstream operators, aligning with these mandates is not only about compliance but also about future-proofing assets and maintaining social license to operate.

    CANUSA EPC’s Role in Supporting Emissions Reductions

    At CANUSA EPC, we understand the complexities of midstream development in a carbon-constrained world. Our multidisciplinary teams are equipped to:

    • Conduct GHG impact assessments
    • Design low-emission natural gas processing plants
    • Integrate carbon capture and methane reduction technologies
    • Engineer and plan electrical system upgrades

    Have any questions or concerns?

    Reach out to our team or start a free Class V estimate today to evaluate pathways to low-cost compliance for lower emission operations.

     

    Author(s)

    Forrest Churchill

     

    External Sources:

    https://www.sos.state.co.us/CCR/GenerateRulePdf.do?ruleVersionId=11724&fileName=5%20CCR%201001-26

    https://www.sos.state.co.us/CCR/GenerateRulePdf.do?ruleVersionId=12032&fileName=5%20CCR%201001-9

    https://cdphe.colorado.gov/changes-to-colorados-greenhouse-gas-reporting-requirements

    https://leg.colorado.gov/bills/HB19-1261

    https://www.sos.state.co.us/CCR/GenerateRulePdf.do?ruleVersionId=11843&fileName=5%20CCR%201001-9

  • One Big Beautiful Bill Boosts 45Q to $85/ton for CO₂-EOR with Geological Storage

    One Big Beautiful Bill Boosts 45Q to $85/ton for CO₂-EOR with Geological Storage

    The recently passed One Big Beautiful Bill Act preserved and enhanced carbon capture and storage (CCS) opportunities. One of the most impactful provisions for carbon capture is the expansion of the 45Q tax credit to $85 per metric ton for CO₂ used in Enhanced Oil Recovery (EOR) when the CO₂ is permanently stored in geological formations. 

    This update significantly improves the financial outlook for oil and gas developers pursuing CO₂-EOR projects that meet geological sequestration criteria. In this article, we break down the implications of this policy shift and how project developers can capitalize on it. 

     

    What’s New in 45Q Under the One Big Beautiful Bill? 

    The One Big Beautiful Bill Act preserves and enhances the 45Q tax credit structure, with a critical clarification: CO₂ used in EOR now qualifies for the full $85/ton credit if it is geologically sequestered. This aligns EOR with saline storage projects in terms of credit value, provided the CO₂ is not vented or recycled but permanently stored underground in accordance with the EPA Class VI well regulations. 

    Key Provisions:

    • $85/ton for CO₂ captured and geologically stored, including via EOR 
    • $60/ton remains for CO₂ used in EOR without geological storage 
    • Transferability and direct pay options remain intact 
    • No sunset clause, offering long-term certainty for developers 

    This change reflects growing recognition of EOR’s role in both emissions reduction and domestic energy production. 

     

    Three 45Q Benefits for CO2-EOR Project Developers 

    1. Higher Credit Value = Better IRR 

    The jump from $60 to $85/ton for qualifying EOR projects can significantly improve project economics. For example, a facility capturing 500,000 tons of CO₂ annually, means an additional $12.5 million/year in direct payments. 

    2. Geological Storage Is Now a Strategic Differentiator 

    Projects that integrate Class VI-compliant injection wells and robust monitoring, reporting, and verification (MRV) protocols can now access the higher credit tier. This incentivizes developers to design for permanence and compliance from day one. 

    3. Financing Becomes More Attractive 

    With higher credit values and continued transferability, tax equity investors are more likely to participate. This opens the door for alternative financing solutions like non-recourse project financing and joint ventures. 

    Animated Image of CO2-EOR System Diagram

    Modular Deployment Reduces Risk and Cost in 45Q-Qualified Projects 

    CO2 projects requirements still incentivize modular execution. Incorporating modular process packages and construction not only reduces risk related to field construction, it’s a strategic tool for moving scope that is governed by 45Q labor requirements onsite to offsite scope; providing lower costs overall and less liability due to prevailing wage. 

     

    Why Modular Execution Matters: 

    Reducing Risk for 45Q Wage Requirements

    • Offsite labor is not subject to prevailing wage reporting or apprenticeship metrics, allowing the project to source market rate labor offsite and lowering the burden cost for the project.
    • Only onsite labor requires detailed reporting for compliance tests for 45Q.  Shifting scope to offsite locations reduced the cost of compliance. 

    Cost Control 

    • Onsite scope is exposed to risks from weather delays and increased mobilization costs to site.  These costs can be better controlled in a fabrication facility, reducing contingency estimates for the project. 
    • Labor demands in regions are affected by activity from all operators and the limited local skill pool.  Leveraging offsite fabrication allows for the scheduling of resources will limit risk to shortages. 

    Timeline Optimization for 45Q Eligibility 

    • Developers can begin construction on initial modules to meet IRS “begin construction” rules under Safe Harbor, securing eligibility while continuing to develop the rest of the project. 

    CANUSA EPC’s execution model brings practical modularization to your project. Read more about some of our projects using modular approaches such as the Helium Multiwell Purification Battery or 50 MMSCFD Gas Compressor Station. 

     

    Technical Requirements for Qualifying CO₂-EOR Projects 

    According to the DOE’s CCUS Appendix H, projects must meet several technical criteria to qualify for the $85/ton credit: 

    • High-purity CO₂ supply (typically >95%) 
    • Compression systems capable of delivering CO₂ at 1,200–2,200 psi 
    • Reservoirs with sufficient porosity and caprock integrity 
    • EPA Class VI injection wells for geological storage 
    • MRV plans approved by the EPA or equivalent state authority 

    Developing a low-cost injection project requires selection of the proper dehydration approach for water-saturated CO2.  CANUSA EPC has released dehydration studies for CO2 projects, helping you select the correct technology for your CO2 project. 

     

    Strategic Recommendations for CO2 EOR Evaluations 

    • Determine Key Performance Metrics: Execute a FEED study to determine the proper metrics for financial investment; levelized cost per mton of CO2 product, carbon intensity to capture and process the CO2, and utility requirements. 
    • Leverage Modular EPC Execution: Accelerate lead times, improve cost control, and reduce compliance costs with modularized systems. 
    • Engage Tax Equity Partners Early: The $85/ton credit makes your project more bankable — capitalize on it. 
    • Audit Your CO₂ Source: Ensure your CO₂ stream meets purity and volume thresholds to qualify. 

     

    Conclusion 

    The One Big Beautiful Bill Act has solidified the opportunity landscape for CO₂-EOR projects. By extending the $85/ton 45Q credit to EOR with geological storage, it rewards projects that combine carbon mitigation with energy production. For developers ready to meet the technical and regulatory requirements, the path to profitability just got a lot clearer. 

    Table Changes For OBBB Act

    Ready to design a CO₂-EOR project that qualifies for $85/ton?
    Connect with us to explore FEED support, modular compression systems, and turnkey EPC execution tailored for carbon capture and EOR. 

     

    PAPER AUTHORS  

    Forrest Churchill 

     

    External Sources: 

    https://www.congress.gov/bill/119th-congress/house-bill/1/text

    https://www.epa.gov/uic/final-class-vi-guidance-documents

    https://energy.sustainability-directory.com/term/non-recourse-financing/ 

    https://www.energy.gov/sites/default/files/2022-10/CCUS-Appendix_H-030521.pdf  

    https://www.globalccsinstitute.com/news-media/latest-news/u-s-preserves-and-increases-45q-credit-in-one-big-beautiful-bill-act/  

  • CO2 Capture – Technology & Marketing

    CO2 Capture – Technology & Marketing

    Summary

    The CO2 market is developing rapidly based on regulations, annual governmental commitments, and voluntary carbon markets. Start to understand the CO2 market from an industrial perspective and understand concepts of Co2 sources, capture technology, and marketing of CO2.

    • Sources: Point Sources, Flue Gas, Production Gas, Atmosphere
    • CO2 Emissions Trends
    • CO2 Capture Types – detailed explanation & notes on improvements
    • How to Market CO2 – EOR, Sequestration, Liquefaction, Pipelines
  • Helium Facility Construction

    Helium Facility Construction

    Summary

    Download the raw gas processing presentation CANUSA EPC delivered at the Helium Super Summit 2023 Conference. Delve into critical topics such as:

    • Strategic site selection and thorough assessment,
    • The pivotal role of utilities,
    • Integration of skidded equipment for efficient processing, and
    • Construction standards ensuring safety and durability.

    The presentation highlights a modular purification unit – a packaged 2.5 MMSCFD Nitrogen-Based Purification Facility.

  • Carbon Capture Feasibility From Compressor Exhaust Streams

    Carbon Capture Feasibility From Compressor Exhaust Streams

    Summary

    Download the presentation from CANUSA EPC’s Carbon Capture Feasibility From Compressor Exhaust Streams Conference Knowledge Bar. Content includes:

    • Methane sources
    • Quantifying the application
    • Carbon capture technology options (Metal Organic Framework & Membrane Technology)
    • Carbon capture execution
    • How to generate revenue through carbon capture
  • Navigating CO2 Project Developments: A Guide for Investment Considerations

    Navigating CO2 Project Developments: A Guide for Investment Considerations

    The development of carbon capture, utilization, and storage (CCUS) projects presents unique opportunities and challenges for investment firms looking to deploy capital into the carbon capture space. CANUSA EPC, with its extensive experience in evaluating and developing carbon capture projects, offers valuable insights and strategies to navigate this complex landscape.

    Determining Your Levelized Cost of CO2

    Determining the internal rate of return requires accurate Capital Expenditures as well as Operational Expenditures to determine the levelized cost of capture and transport of the CO2.

    The CapEx for the facility encompasses the construction of the capture process to provide the CO2 product. A large portion of CO2 project equipment costs will be tied up in compression equipment. Typically, large compression systems are custom-fabricated and require specialized services that are not readily available. Instead, CANUSA EPC recommends deploying compression systems with smaller units in parallel designs. This solution is more likely to:

    • be readily available (compress schedule),
    • allow for efficient capacity modulation of the system,
    • provide efficient scalability for capacity, and
    • produce higher reliability for the project.

    The OpEx to run the facility is predominately based on power consumption. There are important strategies to ensure the facility runs efficiently and power costs are structured appropriately. VFDs and soft starts can be used in combination to lower demand spikes and electricity bills. Read more about electrical drive approaches.

    Technology Development for CO2 Capture

    Capturing CO2 from sources with higher concentrations of CO2 (greater than 8%) leads to lower separation costs and less energy consumption. High concentrations of CO2 present de-risked capture technology, as they can rely on traditional methods. Recent technological deployments for engine emission applications are trending towards $40 per metric ton of CO2. CANUSA EPC highlights that CO2 emissions from amine plants and ethanol facilities are relatively pure and can be economically delivered to pipeline or beverage grade specifications. Read a detailed case study: CO2 Injection & Amine Emissions Capture.

    Transportation: Best By Truck, Rail, or Pipeline?

    Transporting CO2 from the capture site can be done via truck, rail, or pipeline, similar to oil or bulk goods. Trucking is suitable for smaller projects, topping out around 150 metric tons per day (MTPD) due to logistical complexities. Rail applications are viable for projects approaching 400 MTPD when there is an existing train line near the facility. Pipelines are the most efficient way to transport large amounts of CO2 to hubs for injection or distribution to industrial users. CANUSA EPC advises focusing on injecting CO2 into saline reservoirs close to the emitter source in states with primacy over Class II injection wells, as these projects are quicker to approve1.

    What Government Incentives are Applicable to CO2 Capture?

    The long-term commercial use of CO2 as an emission removal tool is still developing. Government programs, such as those funded under the Inflation Reduction Act (IRA), support many active projects through reimbursement programs like 45Q or 45Z. CANUSA EPC emphasizes the importance of executing projects in a manner that meets IRA requirements to take advantage of these incentives. This approach provides flexibility to adapt to any changes in the program. Read more about rebates for your project.

    Approaching Carbon Developments Wisely

    To successfully navigate the complexities of CO2 project development, it’s crucial to consider:

    • developing a levelized cost of carbon that accounts for CapEx and OpEx,
    • leveraging reliable CO2 capture technologies,
    • optimizing transportation methods or remove them with onsite injection, and
    • capitalizing on government incentives.

    By implementing these strategies, investment firms can enhance the efficiency and profitability of their CO2 projects while contributing to a sustainable future.

     

    Let’s work together to help build a financial model for your CO2 project.  With just a few data points, we will provide a report that will bring clarity to your project’s feasibility – request a free Class V Estimate.

     

    Source: 1 https://www.epa.gov/uic/primary-enforcement-authority-underground-injection-control-program-0

     

  • Maximize Efficiency & Reliability In CO2 Injection

    Maximize Efficiency & Reliability In CO2 Injection

    A Dehydration Study

    Summary

    Managing water in CO2 streams is critical to avoid corrosion, downtime & delays. A dehydration study provides an analysis to select the proper technology to mitigate risk & meet project goals. Dehydration technology selection often involves trade-offs between cost, efficiency, and future expandability.

    A comprehensive and unbiased study gives you the confidence to choose the right solution without surprises. What factors are essential in a valuable dehy study? Read more inside.

    This guide includes:

    • Hidden threats of water in CO2 streams
    • Essential components of a CO2 dehydration study framework
    • Comparing 4 key CO2 dehydration technologies
  • Carbon Capture Evaluation

    Carbon Capture Evaluation

    Post-combustion Compressor Exhaust

    Summary

    CANUSA EPC has prepared the following analysis related to the feasibility of carbon capture from the exhaust streams of natural gas driven compressors at a compressor station located in North America. This analysis is based on CANUSA EPC’s experience with carbon capture technologies, applying those existing technologies to exhaust gas from post-combustion processes, and leveraging our project expertise with compressor stations.

    The basis of the analysis considered 27 metric tons per day (MTPD) from a single engine unit, 189 MTPD from seven (7) units, and 300 MTPD with an exhaust stream of 5.59 mol % CO2. Available technologies allow for a recovery of 90 mol % CO2 and a purity of 98 mol % CO2. The findings of the white paper identify the normalized value of CO2 for the various flow rates to develop the economics of these projects. *Based on 2023 industry developments.

    This guide includes:

    • Summary of the process
    • Major equipment
    • Project economics
  • CO2 Dehydration Study Reduces Project Risk: Injection

    CO2 Dehydration Study Reduces Project Risk: Injection

    Excess water in CO2 streams can lead to severe project risks, including equipment failure, blocked pipelines, and compromised system integrity. Without accurate data and a clear strategy, saturated CO2 can cause significant operating challenges. Technology selection during a CO2 injection project impacts profitability, safety, and longevity. A comprehensive CO2 dehydration study is the key to preventing these risks. It provides the clarity you need to make informed technology decisions, ensuring your operations remain safe, reliable and efficient.

    The Hidden Threat of Water in CO2 Streams

    Excess water in CO2 streams poses significant risks, including:

    • Pipeline Corrosion:

      Water reacts with CO2 to form carbonic acid, which can rapidly erode infrastructure.
    • Hydrate Formation:

      Under high-pressure conditions, water can crystallize, causing blockages that disrupt operations.
    • Reduced Injection Efficiency:

      High water content undermines injection reliability, leading to expensive maintenance and unplanned downtime.

    Water content targets typically range from 10 ppm to 50 lb/MMscf, depending on your transportation strategy, materials selection, and injection goals. For projects involving long pipelines or stringent injection requirements, managing water content isn’t optional—it’s essential.

    engineers reviewing dehydration study

    Why a Dehydration Study Is Your Vital First Step

    The right dehydration study transforms uncertainty into clarity. It will provide actionable insights to guide your project and give you confidence with decision-making.

    Here’s how:

    1. Define Project Objectives and Constraints:
      • Document your project’s goals, specifications, and concerns. A clear starting point ensures alignment across project teams.
    2. Understand the Composition of your Gas Stream:
      • Analyze the composition of your CO2 stream, identifying contaminants that may affect dehydration technology performance.
    3. Clear Evaluation of Dehydration Technology Options:
      • Compare technologies based on CapEx, OpEx, operability, and scalability. Focus on solutions that align with your team’s expertise and long-term project needs.
    4. A Transparent and Unbiased Analysis:
      • Selecting dehydration technology often involve trade-offs between cost, efficiency, and future expandability. A comprehensive study gives you the confidence to choose the right solution without surprises.

    Comparing CO2 Dehydration Technologies

    Selecting the right technology depends on your project’s specific needs. A breakdown of common options is below:

    • Glycol Absorption Dehydration using Tri-Ethylene Glycol (TEG):
      • One of the most common technology suitable for many projects.
      • Requires additional modifications to achieve ultra-low water content.
      • Larger footprint and higher maintenance demands.
    • Desiccant Adsorption Systems:
      • Achieves extremely low water content, ideal for stringent requirements.
      • Higher upfront costs due to desiccant materials.
      • Ideal for projects with ultra-low water content targets.
    • Semi-Permeable Membranes:
      • Advanced systems offering high efficiency.
      • Require gas pre-treatment and higher inlet pressures, increasing upfront investment.
      • Ideal for projects needing minimal removal.
    • Chiller/Refrigeration Systems:
      • Uses dew point control to condense water from the vapor phase to a liquid.
      • Options like DEXPro leverage innovative solutions for energy-efficient cooling.
      • Effective for moderate water removal but with limitations on extreme requirements.

    * Detailed characteristics have been compiled for each of these technologies and are available for review by downloading the full dehydration paper.

    oil and gas dehydration equipment

    Real-World Success: Evaluation Findings for CO2 Dehydration

    In a recent CO2 injection project, CANUSA EPC was asked to evaluate dehydration options for reducing water to a 25 lb limit in the gas stream prior to injection.

    The framework of their evaluation can be considered a minimum viable standard for dehydration analysis.

    • Reliability
    • Uptime
    • CapEx and OpEx
    • Safety
    • Schedule Risk
    • Operability/Ease of Maintenance
    • Stakeholder Support
    • Environmental Impact
    • Expansion Potential

    The following dehydration solutions were evaluated to determine which technology would best meet the client’s requirements:

    • Traditional TEG
    • Chiller Package
    • Integrated DEXPro solution

    The result?

    *A detailed comparison table is available for review by downloading the full dehydration paper.

    In this client’s case, DEXPro stood out for its integration capabilities, environmental efficiency, and alignment with the client’s sustainability goals.

    Download the Full Paper on CO2 Injection & Dehydration:

    Access the comparison of key technologies presented in this article by downloading CANUSA EPC’s paper.

    Click here to download: Maximize Efficiency & Reliability in CO2 Injection

    Embarking on a CO2 injection project without a dehydration study is like flying blind. Start with this critical step and ensure the dehydration study follows the framework within the paper – before assembling your project team.

    PAPER AUTHORS: 
    Tevin Champagne, Project Manager
    Connect on LinkedIn

    Josh Hoeft, Project Manager
    Connect on LinkedIn

    Nick Brown, Project Engineer
    Connect on LinkedIn

    Ted Zeiger, PE,  Project Engineering Lead
    Connect on LinkedIn