CANUSA
    • Concept Development
    • Project Definition
    • Design-Build
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Concept Development
    • Project Definition
    • Design-Build
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Helium Purification

Multi-well Helium Purification Battery

Location: Holbrook, AZ

The Challenge

The client wanted a processing facility to be built where a raw gas inlet from four wells would be separated into a helium product with a 99.9+% purity, with future expansion in mind. A few of the challenges the client faced included the implementation of multiple wells into the facility, a desire for a portable system, and the need to generate power onsite with no fuel sources readily available.

The Solution

CANUSA EPC first engaged by performing an initial FEED study to identify what the scope of the project would need to be, and what would be required to make the client’s requests possible. After the FEED study, we provided full-service EPCM support.

  • Project management
  • Procurement & expediting of equipment
  • Facility process design & engineering
  • PHA & safety analysis
  • Facility 3D Modeling, piping & instrument design
  • Power generation & distribution
  • Grading plan & pile layout
  • Structural design & engineering
  • Major equipment factory acceptance testing
  • Controls programming support
  • Construction support

The Results

Capacity & Purity

  • Facility provides 5 MMSCFD inlet capacity and sales product purity of up to 99.996% helium, or grade H4.6 helium utilizing a PSA system.

Portable Capability

  •  Fully-skidded, mobile equipment in sea-can structure allows the Client to reuse and relocate the facility wherever it is needed.

Power Generation

  • Onsite power was generated with a compressed natural gas service while a renewable energy system was constructed.

Explore Other Projects

  • Helium Purification

    Helium Tolling Expansion

    Shiprock, NM
  • Helium Purification

    CO2 Removal from Helium

    Four Corners, AZ

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Concept Development
  • Project Definition
  • Design-Build
  • EPC Resources
  • Expertise
  • Hydrocarbon Development
  • Electrical Power Delivery
  • Industrial Gas Markets
  • Emissions Reduction

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


Denver Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States


Houston Office
11757 Katy Fwy
Houston, TX, 77079
United States

© CANUSA EPC · Privacy Policy