  • EPA Tightens NOx Standards: What Power Generation Developers Should Know About the New Temporary Turbine Rules

    EPA Tightens NOx Standards: What Power Generation Developers Should Know About the New Temporary Turbine Rules

    Introduction

    In January 2026, the U.S. Environmental Protection Agency finalized long-awaited updates to the New Source Performance Standards (NSPS) for stationary combustion turbines—marking the first major revision since 2006. With power generation developers increasingly dependent on flexible, rapid-deployment solutions such as temporary turbines and trailer-mounted generation, these changes bring important implications for project scheduling, emissions compliance, and technology selection.

    This blog outlines what has changed, how the new temporary turbine subcategory works, and what developers should consider as they plan new installations or short-term power solutions.

    Updated NOx Standards for Modern Turbines

    The EPA’s final rule restructures emissions requirements by grouping turbines into subcategories based on:

    • Heat input (MMBtu/hr)
    • Thermal efficiency (≥38% or <38%)
    • Expected utilization (12-month capacity factor)
    • Fuel type and load conditions

    The changes align emissions expectations with what modern combustion controls and SCR technology can realistically achieve.

    Key NOx Standard Revisions

    • Large, high-utilization turbines (>850 MMBtu/hr, >45% CF) must now meet single-digit NOx emissions using combustion controls + SCR.
    • Medium and small turbines retain combustion-controls-only pathways with updated ppm limits.
    • Natural gas remains the basis for hourly emissions performance.
    • SO₂ standards remain unchanged, with more flexible compliance options.

    For developers, these updates will influence technology specifications, EPC execution planning, and permitting timelines.

    The New Temporary Turbine Subcategory

    The 2026 rule introduces a dedicated regulatory framework for stationary temporary combustion turbines, addressing an industry need for short-term, flexible power during outages, commissioning, construction sequencing, or emergency support.

    Key Features of the Temporary Turbine Category

    • Applies to turbines up to 850 MMBtu/hr
    • Limited to 24 months at a given location
    • NOx standard: 25 ppm using combustion controls only
    • Reduced monitoring and recordkeeping
    • Exempts certain portable Title II-covered engines
    • Prevents “serial swapping” to extend temporary status

    This category enables faster, more efficient deployment of turbine temporary power and trailer-mounted power generation systems—without excessive compliance burden.

    MW Output Estimates Based on EPA Heat Input Categories

    Because EPA regulates turbines by heat input (MMBtu/hr), developers often need a practical translation into MW output. Using typical turbine thermal efficiencies, here is a rough guide:

    Turbine CategoryHeat InputEfficiencyApprox. MW Output
    Large>850 MMBtu/hr≥38%~95 MW
    Medium50–850 MMBtu/hr≥38%5–95 MW
    Small≤50 MMBtu/hr30–38%4–6 MW
    Temporary Turbines≤850 MMBtu/hr30–38%5–95 MW

    These estimates help developers size temporary solutions and anticipate the emissions requirements tied to turbine selection.

    Economic and Project Delivery Implications

    According to EPA’s Economic Impact Analysis, the updated rule is expected to:

    • Reduce annual NOx emissions by up to 296 tons by 2032
    • Save industry up to $87 million over eight years
    • Focus SCR deployment only on large, high-duty units where it is cost-justified

    For developers, this results in:

    • Lower capital costs for many turbine classes
    • Continued viability of non-SCR combustion turbines
    • Streamlined permitting for temporary deployments
    • Enhanced flexibility in project scheduling and outage planning

    The regulatory environment now better supports short-term and contingency power solutions.

    What Developers and Turbine Representatives Should Do Now

    1. Assess Turbine Classification Early
    Efficiency, utilization, and heat input now directly determine regulatory requirements.

    2. Factor in Temporary Power Strategy
    Temporary turbines provide cost-effective coverage for outages, interconnection delays, and commissioning.

    3. Coordinate with OEMs and EPC Partners
    Thermal efficiency thresholds and NOx limits influence model selection and long-term operating strategy.

    4. Review Documentation Requirements
    Temporary status requires manufacturer certification and periodic (five-year) testing records.

    Conclusion

    The EPA’s updated NOx standards significantly modernize the emissions landscape for new and modified turbines. For developers and OEM representatives, the changes reinforce the need to plan turbine selection and temporary power strategies early in the project lifecycle. With the introduction of the temporary turbine subcategory, the industry gains a more flexible, streamlined path for meeting both short-term and long-term power generation needs.


    If you need support navigating the new NOx standards, evaluating turbine options, or planning temporary generation during outages and construction, our team is here to help you develop a compliant and cost-effective strategy.

    __________

    Author(s)

    Marc Collins

  • Compressor Station Emission Reduction

    Compressor Station Emission Reduction

    Summary

    Download the presentation CANUSA EPC delivered at the 2024 GPA Midstream Technical Conference. Content includes:

    • Review of typical compressor site
    • Methods for evolving standard compressor station designs – specifically reviewing cost and power reduction
    • 4 key developments to watch for as the industry evolves, and
    • 3 steps you can start today to get a handle on your emissions
  • Carbon Capture Feasibility From Compressor Exhaust Streams

    Carbon Capture Feasibility From Compressor Exhaust Streams

    Summary

    Download the presentation from CANUSA EPC’s Carbon Capture Feasibility From Compressor Exhaust Streams Conference Knowledge Bar. Content includes:

    • Methane sources
    • Quantifying the application
    • Carbon capture technology options (Metal Organic Framework & Membrane Technology)
    • Carbon capture execution
    • How to generate revenue through carbon capture
  • Canada Methane Emissions

    Canada Methane Emissions

    Understanding Methane Regulations In Energy Production

    Summary

    Canada’s commitment to environmental stewardship is reflected in its methane emission regulations, aimed at significantly reducing emissions from the oil and gas sector. The latest amendments to the regulations set a bold target to cut methane emissions by at least 75% from 2012 levels by 2030.

    Provincial efforts complement the federal regulations through equivalency agreements that must align with or exceed federal standards. These agreements allow provinces to implement tailored strategies that address specific regional challenges associated with methane emissions.

    This guide is provided with the intention to bring clarity to the regulations that impact your operations, providing a clear and concise overview that aids understanding and compliance.

    This Canadian Methane Emissions guide includes:

    • Overview of methane regulations (2023 data)
    • Federal regulation overview for Canada
    • Key provincial regulations for Western Canadian operators
  • US Methane Emissions

    US Methane Emissions

    Understanding Methane Regulations In Energy Production

    Summary

    The US government has taken decisive steps to combat methane pollution. Navigating the maze of emissions regulations in the North American oil and gas sector can be a daunting task, even for the most seasoned professionals.

    This guide was created with the intention to bring clarity to the regulations, such as OOOO(b) that impact your operations, providing a clear and concise overview that aids understanding and compliance on USA methane emissions.

    This USA methane emissions guide includes:

    • Overview of current state of methane regulations (key 2023 data)
    • Federal regulation overview for USA
    • Key state regulations for US operators
    • Highlights EPA & OOOO(b)
  • Navigating OOOO(b): Methane Emission Reduction Cost-Management Strategies for Compression Sites

    Navigating OOOO(b): Methane Emission Reduction Cost-Management Strategies for Compression Sites

    Gas compression facilities in the USA must adapt to the EPA’s latest methane regulations (Final Rule1), Subpart OOOO(b), which mandate significant reductions in methane emissions from key equipment. Executing emission reduction projects presents opportunities to leverage a strategic approach to engineering, procurement, and construction (EPC) to maintain cost efficiency.

    What is OOOO(b) Compliance?

    The EPA’s OOOO(b) Rule is a major regulatory update aimed at curbing methane emissions from oil and gas operations. The EPA’s Rule mandates “strict performance standards for new, modified, and reconstructed sources”.

    For gas compression facilities, compliance requires a shift in operational practices. There are three distinct applications that apply:

    Process Controllers & Pneumatic Pumps – Natural gas-driven controllers and pneumatic pumps, which historically vented methane into the atmosphere, must be replaced with zero-emission alternatives (IE. instrument air-driven controllers).

    Dry Seals for Compressors – Dry-seal centrifugal compressors must maintain a volumetric flow rate at or below 10 standard cubic feet per minute (scfm) per compressor seal to minimize emissions.

    Storage Vessels/Tank Batteries – Storage tanks at compression stations must now achieve a 95% reduction in methane and VOC emissions, significantly changing how operators manage emissions control systems.

    GET THE OOOO(b) GUIDE

    Compliance Dates with EPA 40 CFR Part 60, Subpart OOOO?

    Originally published in December 2023, EPA’s Final Rule(1) provided lead time for industry to comply. This subpart establishes emission standards and compliance schedules for the control of volatile organic compounds (VOC) and sulfur dioxide (SO2) emissions from affected oil and gas facilities that commence construction, modification, or reconstruction after December 6, 2022.

    Compliance with the new performance standards is stated in section 60.5370b2. “You must be in compliance with the standards of this subpart no later than May 7, 2024, or upon initial startup, whichever date is later, except as specified per….”

    This deadline has forced operators to focus on upgrades in an accelerated manner. With the right plan in place, you can realize cost savings and operational efficiencies.

    Instrument Air Conversions: Save Time & Money

    Converting from instrument gas to instrument air across multiple sites is a capital-intensive process. In a recent methane reduction project, CANUSA EPC achieved substantial cost savings and accelerated schedule for their operator using these strategies.

    Develop a Compliance Program Team

    Project Manager, Josh Hoeft, explains “the most cost-effective approach is to develop a Compliance Program – a structured, regional approach where you select a preferred EPC firm, issue a bulk order on IA package for volume discounting and guaranteed delivery schedules, and contract a regional construction firm familiar with the sites. This eliminates redundancies, reduces costs, and streamlines your path to compliance.”

    Template-Based Engineering

    “Experienced EPCs should be utilizing a template-based approach to engineering – a copy-paste design format across facilities. This approach:

    • expedites execution,
    • minimizes engineering re-work, and
    • ensures uniformity in documentation for installation

    At CANUSA EPC, we’ve realized reduced engineering costs by up to 25% per site when we execute a Compliance Program on multiple sites (as compared to a single site),” says Hoeft.

    Package Negotiations

    Bulk procurement of IA systems can result in total project cost reductions of 10%. A Compliance Program recognizes savings on the purchase price of equipment, and the schedule for delivery can also be staggered –  allowing the engineering and construction team to streamline their engagements to reduce demobilization costs.

    Lessons learned from the first or second installation are incorporated into the execution plan. Every future installation becomes more efficient, creating a ‘snowball effect’. When executing multiple sites concurrently, you do not realize these benefits.

    Single-Sourced Contractor

    Having a dedicated contractor on multiple sites will improve efficiencies for scope development and allow the contractor to remove risk from their estimates, resulting in site costs that finish on budget. Contractors can develop a plan to support operations and minimize downtime, which often is the largest cost for these compliance projects – missed operating revenue.

    OOOO(b) Planning & Operational Efficiencies

    From past compliance projects, CANUSA EPC has found critical execution aspects that impact schedule and add risk to project costs.

    Engaging Utilities Early

    Electrical power capacity and availability must be analyzed early. This determines whether the existing electrical infrastructure (on site and from the utility) can accommodate the new loads required for OOOO(b) projects.

    Electrical utilities are often backlogged. Requesting new/upgraded services or electrical equipment, like transformers, can result in long and unexpected lead items. It can take several months for the local power provider to run a new power line or install a new bucket transformer if the utility is the limiting factor.

    Engaging utilities early in the design process can prevent significant delays.

    Involve Site Operations in Design

    From an engineering perspective, early and continuous engagement with operations personnel is critical. Facility staff possess in-depth knowledge of site-specific factors  – existing infrastructure, space constraints, and potential integration challenges. Their input optimizes pipe routing, equipment placement, and ensures IA systems are designed with future facility expansions in mind.

    Since operators are responsible for routine inspections and emissions monitoring, their early input ensures new systems are both practical and sustainable.

    If your EPC is not involving your operations team from the outset, you may lose foresight on site functionality, long-term maintenance, and accessibility. Collaboration also helps your EPC understand operational priorities, reducing the risk of installing systems that require extensive modifications after deployment.

    Planning for Reduced Downtime and Increased Reliability

    Facility outages and prolonged downtime affect your bottom line. Engaging operations will plan for final mechanical tie ins and reduce facility downtime. On-site staff are knowledgeable about which equipment is critical for continued operation and can provide tie in plans that may avoid a facility shutdown.

    If electrical tie ins require energy isolation, affecting critical equipment like the station PLC, developing a temporary power plan using a generator can be a viable option to keep the station running during the tie ins.

    Abnormal operation of natural gas facilities – during start-ups and shutdowns – present the most hazardous operating scenarios when compared to steady state operation. Avoiding facility shutdowns altogether helps mitigate unsafe operating conditions.

    Long-Term Benefits and Regulatory Compliance

    For gas compression facilities, the implementation of OOOO(b) compliance measures satisfies regulatory requirements and creates opportunities for operational efficiencies. Companies that invest in structured IG-to-IA conversion programs, bulk material procurement, and standardized engineering designs will benefit from reduced compliance costs, improved environmental performance, and increased asset reliability.

    Moving Forward with Compliance

    Are you confident about what deadlines apply to your facilities?

    CANUSA EPC has created a OOOO(b) Guide to help you gain clarity on what EPA Methane Rules apply to your compression operations.

    1. Simplified EPA Matrix focusing only on dry seals, pumps, storage vessels, fugitive emissions, and process controllers.
    2. Decision-making diagrams to guide you on what OOOO(b) sub-rules are pertinent – dry seal venting of centrifugal compressors, gas pneumatic devices, fugitive emissions, storage vessel, and pumps.
    3. Project Profiles detailing specific approaches for dry seal capture, tank venting emissions reduction, and IG-to-IA conversion.

    GET THE OOOO(b) GUIDE

     

    Connect with Josh Hoeft on LinkedIn 

    Connect with Megan Hurley on LinkedIn


    SOURCES:
    1 EPA Methane Final Rule: epa.gov/controlling-air-pollution-oil-and-natural-gas-operations/epas-final-rule-reduce-methane-and-other

    2 EPA 40 CFR Part 60 New Performance Standards 60.5370b2: ecfr.gov/current/title-40/section-60.5370b

     

  • Methane Reductions with the “Stick”

    Methane Reductions with the “Stick”

    The Methane Fee was created by the Inflation Reduction Act of 2022 (IRA). The IRA added a new Section 136 to the Clean Air Act (CAA) that set up the “Methane Emissions and Waste Reduction Incentive Program for Petroleum and Natural Gas Systems” and instructed the EPA to issue rules to calculate the charge and determine who qualifies for exemptions offered by the IRA. 

    Waste Emissions Fee (WEC) Explained 

    The EPA’s proposed  Methane Emissions Reduction Program could create substantial new annual costs for the oil and gas sectors starting in March 2025. In its Proposed Rule, the EPA explains how sources should estimate their asset’s emissions limit that triggers the per-ton charge for emissions above that limit. The new fee applies to nine categories of “applicable facilities” reporting more than 25,000 metric tons of carbon dioxide equivalent (CO2e) of greenhouse gas emissions under EPA’s Greenhouse Gas Reporting Rule, found in 40 CFR Subpart W: 

    • offshore petroleum and natural gas production  
    • onshore petroleum and natural gas production 
    • onshore natural gas processing 
    • onshore natural gas transmission compression 
    • underground natural gas storage 
    • liquified natural gas (LNG) storage 
    • LNG import and export equipment 
    • onshore petroleum and natural gas gathering and boosting 
    • onshore natural gas transmission pipelines 

    The statute defines three different levels for “applicable facilities” to determine the quantity of excess emissions used to compute the charge, mainly based on the proportion of natural gas delivered to a sales line or flowing through a facility. 

    Determine Your Facility Emissions Threshold 

    Based on the type of facility your operations qualify under, threshold calculations will be calculated based on the processing or production profile.  The below table is the current data available from the EPA. 

    Emissions Threshold Used to Calculate Fee 

    Facility Type Emission Standards 
    Onshore and offshore petroleum and natural gas production facilities Emissions that exceed 0.20% of natural gas sent to sale from the facility or 10 metric tons of methane per million barrels of oil sent to sale if no natural gas was sent to sale from the facility 
    Onshore natural gas processing, LNG storage, LNG import and export equipment, or onshore petroleum and natural gas gathering and boosting facilities Emissions that exceed 0.05% of the natural gas sent to sale “from or through” the facility 
    Onshore natural gas transmission compression, underground natural gas storage, or onshore natural gas transmission pipeline facilities Emissions that exceed 0.11% of the natural gas sent to sale “from or through” the facility 

     

    The EPA gave an example of how to calculate a threshold for an onshore oil or gas production facility that reports emitting 3,000 metric tons of methane: 

    • Waste emissions threshold = throughput x segment-specific intensity x density of CH4 
    • Waste emissions threshold = 60,000,000 Mscf x 0.002 x 0.0192 mt/Mscf 
    • Waste emissions threshold = 2.304 mt CH4 

    The Cost of Methane 

    The fee structure for WEC will increase over the proposed schedule through 2027.  Operators should be planning for 2025 reporting of 2024 emissions under their Subpart W – GHG Reporting program. 

    Year Charge for Excess Emissions 
    2025 $900 per ton above waste emissions threshold for 2024 emissions 
    2026 $1,200 per ton above waste emissions threshold for 2025 emissions 
    2027 and beyond $1,500 per ton above waste emissions threshold for the preceding year’s emissions 

    Facilities must calculate and pay the WEC based on their emissions in the previous year by March 31, which coincides with the deadline for Subpart W annual reports to the EPA. For example, if the facility above emits 3,000 metric tons of methane in 2024, then it would surpass its threshold by 696 tons, and it would owe the EPA a $626,400 fee by March 31, 2025. EPA is seeking comments on whether the initial filing deadline should be delayed for the first reporting year. 

    This WEC structure on top of the new rules from 40 CFR Subpart OOOO – Subpart OOOO —Standards of Performance for Crude Oil and Natural Gas Facilities regarding methane venting will require operators to plan for increased spend on the reduction of methane emissions.  To stay up to speed on other emission regulation developments, download our USA Emissions Whitepaper. 

    CANUSA EPC understands that this will be an important part of discussion with clients for capital planning and we will be developing processes and tools to help clients stay informed and navigate this changing regulatory environment.  Venture over to our codes and standard whitepaper to read about emissions reduction regulations in your area of operations or use our emissions reduction calculator to start determining the return on your investment while reducing your methane emissions. 