CANUSA
    • Concept Development
    • Project Definition
    • Design-Build
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Concept Development
    • Project Definition
    • Design-Build
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Gathering and Transmission

Composite Pipeline

Location: Gift Lake, AB

The Challenge

Current development plans in the area required our Client to replace truck-in propane with pipeline quality fuel gas at their wellsite’s and battery facilities. To accommodate further development plans in the area, the pipeline required provisions to tie-in to future wellsite’s, batteries and pipeline segments.

The Solution

CANUSA EPC provided full discipline engineering to develop the construction packages for the Client.

  • Developed a plan to meet Client expectations
    • Leveraged previous pipeline design experience
    • Leveraged in-house process and design experts
  • Sourced materials
    • Pressure control valve
    • ESD valve
    • Carbon steel to HDPE transition pieces
    • HDPE line pipe and fittings
  • Executed value engineering to support the project schedule
    • Designed and implemented over pressure protection and pressure control to connect pipelines with different MOP’s
    • Worked with AER to expedite the pipeline license down from 6 weeks to 1 week

The Results

  • Provided construction with a detailed work package
    • Installed 14 km of new fuel gas pipeline tying into 9 wellsites and 1 existing pipeline
    • Installed risers and blinds for future wellsite tie-in’s
  • Construction executed with minimal environmental impact
    • Pipeline was installed by plowing, minimizing disturbance to the surrounding area
    • Water course crossings HDD bored to minimize ecological impact

Explore Other Projects

  • Gathering and Transmission

    Pipeline System Expansion

    Montney, BC
  • Gathering and Transmission

    120 MMSCFD Compressor Site Expansion

    Gillette, WY
  • Gathering and Transmission

    Greenfield Compressor Station

    USA

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Concept Development
  • Project Definition
  • Design-Build
  • EPC Resources
  • Expertise
  • Hydrocarbon Development
  • Electrical Power Delivery
  • Industrial Gas Markets
  • Emissions Reduction

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


Denver Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States


Houston Office
11757 Katy Fwy
Houston, TX, 77079
United States

© CANUSA EPC · Privacy Policy