CANUSA
    • Concept Development
    • Project Definition
    • Design-Build
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US
  • Execution
    • Concept Development
    • Project Definition
    • Design-Build
  • EPC Expertise
    • Hydrocarbon Development
    • Electrical Power Delivery
    • Industrial Gas Markets
    • Emissions Reduction
  • EPC Resources
  • About Us
    • Leadership
    • Environmental Social & Governance
    • Careers
  • Contact US

EXECUTION

Gathering and Transmission

120 MMSCFD Compressor Site Expansion

Location: Gillette, WY

The Challenge

Growing gas production necessitated our client expand one of their compressor stations, doubling the capacity and total installed horsepower. The original design of the low-pressure inlet was originally designed for two slug catchers, leading to concern over liquid management onsite. The high-pressure inlet did not allow for blending for dehydration optimization. Late into execution of the project, the existing high-pressure 3-phase separator was upsized to improve liquid removal and dehydration performance.

The Solution

Developed a plan and budget:

  • Executed onsite visits and as-built documentation of existing facility
  • Reviewed operational improvements for the expansion
  • Developed design basis to capture required project technical requirements

Source new equipment:

  • Low-pressure inlet slug catcher
  • High-pressure 3-phase separator
  • Motor Control Center (MCC) expansion

Execute value engineering to support the project schedule:

  • P&ID generation
  • Equipment evaluation
  • PSV sizing calculations and safety review
  • Engineered valve specification
  • 3D modeling
  • Construction packages for electrical, mechanical, and civil bids

The Results

Engineering:

  • Up-to-date engineering package for the site
  • Future compressor additions require no additional mechanical design
  • Developed plan for short shutdown window for tie-ins

Operations:

  • Addressed issues with high-pressure drains to VRU
  • Improved isolation and access to compressor packages
  • Consolidated planned equipment for a two-inlet design to single inlet

Explore Other Projects

  • Gathering and Transmission

    Pipeline System Expansion

    Montney, BC
  • Gathering and Transmission

    Greenfield Compressor Station

    USA
  • Gathering and Transmission

    Greenfield 50 MMSCFD Compressor Station

    Northeast BC

EPC Resources
for Energy Leaders

Our library of whitepapers, presentations, news updates, and online tools are designed to equip and support you.

Visit Resources
  • Execution
  • Concept Development
  • Project Definition
  • Design-Build
  • EPC Resources
  • Expertise
  • Hydrocarbon Development
  • Electrical Power Delivery
  • Industrial Gas Markets
  • Emissions Reduction

Contact

Canada: 403-723-4256
USA: 833-744-4887


info@canusaepc.com


LinkedIn

Offices

Canada Office
630, 8th Ave SW, Suite 500
Calgary, AB, T2P1G6
Canada


Denver Office
600, 17th St, Suite 1400N
Denver, CO, 80202
United States


Houston Office
11757 Katy Fwy
Houston, TX, 77079
United States

© CANUSA EPC · Privacy Policy