GAS COMPRESSION
SIM Solution – 50 MMscf/d Compressor Station
LOCATION: Northeast British Columbia
MARKET: Gas
DAYS OF CONSTRUCTION: 7 months
THE CHALLENGE
The client had an aggressive drill program that required compression, dehydration and sweeting of gas prior to entering into the Spectra Pipeline system. This project was extremely schedule driven – from conception to gas flowing in 7 months.
THE SOLUTION
- CANUSA EPC provided a single point of contact for all vendors
- CANUSA EPC was able to execute the project in 7 months by having ready designs and a strong packager team put together.
- CANUSA EPC was able to adapt to changing well pad and inlet conditions
- Designed and Implemented a 50 MMSCF/day Compressor station which required Dehydration, H2S sweeting for fuel gas and adjacent water handling
- This project had inlet and pressure of 150 PSI and outlet pressure of 1200 PSI and was part of larger gathering system consisting of pipelines, wellpads and a LACT