COMPOSITE PIPELINE

Fuel Gas Distribution

LOCATION: Gift Lake, AB
MARKET: Pipelines & Gathering Systems

 

THE CHALLENGE:

Current development plans in the area required our Client to replace truck-in propane with pipeline quality fuel gas at their wellsite’s and battery facilities. To accommodate further development plans in the area, the pipeline required provisions to tie-in to future wellsite’s, batteries and pipeline segments.

THE SOLUTION

CANUSA EPC provided full discipline engineering to develop the construction packages for the Client.

  • Developed a plan to meet Client expectations
    • Leveraged previous pipeline design experience
    • Leveraged in-house process and design experts
  • Sourced materials
    • Pressure control valve
    • ESD valve
    • Carbon steel to HDPE transition pieces
    • HDPE line pipe and fittings
  • Executed value engineering to support the project schedule
    • Designed and implemented over pressure protection and pressure control to connect pipelines with different MOP’s
    • Worked with AER to expedite the pipeline license down from 6 weeks to 1 week

THE RESULTS

  • Provided construction with a detailed work package
    • Installed 14 km of new fuel gas pipeline tying into 9 wellsites and 1 existing pipeline
    • Installed risers and blinds for future wellsite tie-in’s
  • Construction executed with minimal environmental impact
    • Pipeline was installed by plowing, minimizing disturbance to the surrounding area
    • Water course crossings HDD bored to minimize ecological impact