GAS GATHERING SYSTEM

Greenfield 50 MMSCFD Compressor Station

LOCATION: Northeast BC
MARKET: Pipelines & Gathering Systems

THE CHALLENGE

The client had an aggressive drill program that required compression, dehydration and sweetening of gas prior to entering into the Spectra Pipeline system. This project was extremely schedule driven – from conception to gas flowing in 7 months.

THE SOLUTION

CANUSA EPC provided engineering and procurement services.

  • Facility design was adapted to changing well pad and inlet conditions
  • Deployed dehydration, H2S sweeting for fuel gas and adjacent water handling system
  • Facility designs to handle an inlet pressure of 150 psig and an outlet pressure of 1200 psig
  • Artic packages utilized for speed of field deployment compared to field erected buildings

THE RESULTS

  • The project was completed in 7 months by utilizing an existing design and a strong packager team
  • Deployed as an integrated field system to support a larger gathering system consisting of pipelines, well pads and a LACT
Top